Avaliação operacional e econômica do "feller-buncher" em dois subsistemas de colheita de florestas de eucalipto
| dc.contributor.author | Moreira, Fábio Murilo Tieghi | |
| dc.contributor.author | Souza, Amaury Paulo de | |
| dc.contributor.author | Machado, Carlos Cardoso | |
| dc.contributor.author | Minetti, Luciano José | |
| dc.contributor.author | Silva, Kátia Regina | |
| dc.date.accessioned | 2017-12-21T09:40:55Z | |
| dc.date.available | 2017-12-21T09:40:55Z | |
| dc.date.issued | 2004-04-30 | |
| dc.description.abstract | O objetivo deste trabalho foi avaliar técnica e economicamente o feller-buncher em dois subsistemas de colheita em florestas de eucalipto. A análise técnica englobou um estudo de tempos e movimentos e de produtividade. A análise econômica englobou os parâmetros custo operacional, custo de produção e rendimento energético. O elemento parcial que consumiu a maior parte do tempo do ciclo operacional foi o busca e corte, com aproximadamente 50% do tempo total do ciclo nos dois subsistemas. Os elementos deslocamento vazio e descarregamento consumiram cerca de 39% do tempo total do ciclo do feller-buncher. O custo operacional do feller-buncher foi de US$55,27/he; os custos de produção foram de 1,69 e 1,55 US$/m3cc, nos subsistemas 1 e 2, respectivamente; e o rendimento energético foi de 4,45 e 4,09 g/kW*m3cc, nos subsistemas 1 e 2, respectivamente. | pt-BR |
| dc.description.abstract | This work aimed to evaluate a feller-buncher operationally and economically, under two eucalyptus forest harvest subsystems. The operational analysis included a productivity and motion and time study. The economic analysis included the parameters operational cost, production cost and energy consumption. Searching and cutting consumed most of the operational time, approximately 50% of the total cycle time in both subsystems. Empty displacement and unloading consumed together about 39% of the total feller-buncher cycle time. The feller-buncher operational cost was US$55.27/he. The production costs were US$1.69 and 1.55/m3cc in subsystems 1 and 2, respectively. The energy consumption rates were 4.45 and 4.09 g/kW*m3cc in subsystems 1 and 2, respectively. | en |
| dc.format | pt-BR | |
| dc.identifier.issn | 1806-9088 | |
| dc.identifier.uri | http://dx.doi.org/10.1590/S0100-67622004000200006 | |
| dc.identifier.uri | http://www.locus.ufv.br/handle/123456789/15887 | |
| dc.language.iso | por | pt-BR |
| dc.publisher | Revista Árvore | pt-BR |
| dc.relation.ispartofseries | v. 28, n. 2, p. 199-205, Mar./Abr. 2004 | pt-BR |
| dc.rights | Open Access | pt-BR |
| dc.subject | Colheita florestal | pt-BR |
| dc.subject | Custo e mecanização florestal | pt-BR |
| dc.title | Avaliação operacional e econômica do "feller-buncher" em dois subsistemas de colheita de florestas de eucalipto | pt-BR |
| dc.type | Artigo | pt-BR |
