Estabilização química do subleito de estradas: influência do tempo decorrido entre a mistura e a compactação na resistência mecânica de misturas solo-RBI Grade 81
| dc.contributor.author | Trindade, Tiago Pinto da | |
| dc.contributor.author | Lima, Dario Cardoso de | |
| dc.contributor.author | Machado, Carlos Cardoso | |
| dc.contributor.author | Carvalho, Carlos Alexandre Braz de | |
| dc.contributor.author | Schaefer, Carlos Ernesto Gonçalves Reynaud | |
| dc.contributor.author | Fontes, Maurício Paulo Ferreira | |
| dc.contributor.author | Caneschi, Fernando Paulo | |
| dc.date.accessioned | 2017-12-19T17:14:13Z | |
| dc.date.available | 2017-12-19T17:14:13Z | |
| dc.date.issued | 2005-04-20 | |
| dc.description.abstract | Este artigo aborda o estudo da influência do tempo decorrido entre mistura e compactação na resistência mecânica de três solos da Zona da Mata Norte de Minas Gerais, Brasil, quando estabilizados com 4% de RBI Grade 81, em relação ao peso de solo seco. Um solo residual maduro (solo 1) e dois solos residuais jovens (solos 2 e 3) de gnáisse foram utilizados no presente estudo. O programa de ensaios de laboratório englobou: (i) tempos decorridos entre mistura e compactação: 0, 4, 8 e 24 horas; (ii) energia de compactação: Proctor Modificado; (iii) período de cura das misturas: 7 dias; e (iv) determinação da resistência mecânica: média de três determinações da resistência à compressão não-confinada. Os resultados desta pesquisa indicam que: (i) o tempo decorrido entre mistura e compactação dos corpos-de-prova influenciou significativamente o parâmetro resistência à compressão não confinada das misturas; (ii) 4 horas foi o tempo ótimo entre mistura e compactação para as misturas dos solos 1 e 2 com RBI Grade 81; e (iii) no solo 3, foi observado um melhor resultado para a compactação imediatamente após a mistura. | pt-BR |
| dc.description.abstract | This paper describes the study of the influence of time between mixture and compaction in the mechanical strength of three soils from ";Zona da Mata Norte";, Minas Gerais, Brazil, stabilized with 4% of RBI Grade 81. One mature (soil 1) and two young (soils 2 and 3) gneiss residual soils were used throughout the study. The laboratory testing program consisted of the following steps: (i) elapsed times between mixture and compaction: 0, 4, 8 and 24 hours; (ii) mixture specimen compaction effort: Modified Proctor; (iii) mixture specimen curing time: 7 days in acclimatized room; (iv) determination of mechanical strength: average of three determinations of unconfined compression strength. The testing data supported that: (i) the elapsed time between mixture and specimen compaction affected significantly the mixture mechanical strength; (ii) 4 hours was the optimum elapsed time for soils 1 and 2 mixtures; (iii) the best result for soil 3 was the compaction effort applied immediately after the mixture. | en |
| dc.format | pt-BR | |
| dc.identifier.issn | 1806-9088 | |
| dc.identifier.uri | http://dx.doi.org/10.1590/S0100-67622005000300008 | |
| dc.identifier.uri | http://www.locus.ufv.br/handle/123456789/15703 | |
| dc.language.iso | por | pt-BR |
| dc.publisher | Revista Árvore | pt-BR |
| dc.relation.ispartofseries | v.29, n.3, p.413-418, Maio/jun. 2005 | pt-BR |
| dc.rights | Open Access | pt-BR |
| dc.subject | Estabilização de solos | pt-BR |
| dc.subject | RBI Grade 81 | pt-BR |
| dc.subject | Tempo decorrido entre a mistura e a compactação e resistência à compressão não-confinada | pt-BR |
| dc.title | Estabilização química do subleito de estradas: influência do tempo decorrido entre a mistura e a compactação na resistência mecânica de misturas solo-RBI Grade 81 | pt-BR |
| dc.type | Artigo | pt-BR |
