Use este identificador para citar ou linkar para este item:
https://locus.ufv.br//handle/123456789/3750
Tipo: | Dissertação |
Título: | Coordenação e compatibilização de projetos para construção de edifícios: estudos de casos em instituições públicas e privadas |
Título(s) alternativo(s): | Coordination and compatibility of design for construction of buildings: case studies in public and private institutions |
Autor(es): | Cruz, Gabriela Pontes Silva |
Primeiro Orientador: | Tibiriçá, Antônio Cleber Gonçalves |
Primeiro coorientador: | Paes, José Luiz Rangel |
Segundo coorientador: | Alvarenga, Rita de Cassia Silva Sant' Anna |
Primeiro avaliador: | Carvalho, Aline Werneck Barbosa de |
Segundo avaliador: | Lopes, Roberto de Almeida Goulart |
Abstract: | Problemas relacionados com projeto, como detalhamento insuficiente das informações e falhas de compatibilização ou coordenação, são causas de grande parcela das perdas de eficiência na construção de edifícios. Em função disso, neste trabalho, foram realizados o estudo de projetos de dois edifícios públicos e a prospecção de processo de projetos em três construtoras de Viçosa-MG. Das obras públicas, são apresentados dois estudos: um do Edifício de Laboratórios de Engenharia e outro do Edifício do Centro de Ciências Humanas II. No primeiro, foi feita a análise do projeto executivo, com avaliação dos projetos, das incompatibilidades entre os projetos das várias disciplinas, e a apresentação do projeto de alvenaria. Quanto ao segundo, apresentam-se e discutem-se os erros de
incompatibilidades de projeto percebidos durante a execução da obra. Ambos os estudos são pautados por relatórios técnicos de uma equipe da Universidade Federal de Viçosa (UFV). Nas três empresas da cidade de Viçosa-MG, foi realizada uma prospecção do processo de projetos, por meio da qual puderam ser estudados vários pontos relacionados ao projeto e suas consequências para a produção de um edifício. Dessa prospecção consta: discussão relativa a projeto e sua execução; projetos executados pelas empresas; projetos executivos elaborados pelas empresas; entendimento e uso da racionalização construtiva, da coordenação e da compatibilização de projetos pelas empresas; e a construção dos projetos elaborados pelas empresas. O constatado nos casos estudados nos setores público e privado confirma a necessidade e a importância de uma coordenação no processo de projetos e a indispensável compatibilização dos
projetos executivos para a produção de um edifício, aspectos indispensáveis
para a eficiência e obtenção da qualidade na execução e uso de edificações. Problems related to the design, as detailing insufficient information and of compatibility or coordination failures, are causes of large portion of losses of efficiency in building construction. As a result, in this essay was performed the study of two public buildings and exploration of design process in three building in Viçosa-MG. Public works, are presented two studies: one of the Engineering Laboratory Building and another building of the Center for Humanities II. At first, the analysis was made of the executive design, with evaluation of projects, incompatibilities between the various disciplines of design, and the presentation of the masonry design. The second, we present and discuss the incompatibility errors design discovered during construction. A team of technical reports guides both studies from Universidade Federal de Viçosa (UFV). In the three companies in the city of Viçosa-MG, was performed a survey of the design process, whereby could be studied several points related to the design and its consequences for the production of a building. This survey included: discussion of the design and its implementation; projects performed by companies, executive design developed by the company, understanding and use of constructive rationalization, design coordination and compatibility by companies, and the construction from the design developed by companies. The observed in the cases studied in the public and private companies confirms the need and importance of coordination in the design process and the essential compatibility of executive design for the production of a building, essential aspects for efficiency and achievement of quality in execution and use of buildings. |
Palavras-chave: | Coordenação Compatibilização Projeto executivo Coordination Compatibility Executive design |
CNPq: | CNPQ::ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL |
Idioma: | por |
País: | BR |
Editor: | Universidade Federal de Viçosa |
Sigla da Instituição: | UFV |
Departamento: | Geotecnia; Saneamento ambiental |
Citação: | CRUZ, Gabriela Pontes Silva. Coordination and compatibility of design for construction of buildings: case studies in public and private institutions. 2011. 106 f. Dissertação (Mestrado em Geotecnia; Saneamento ambiental) - Universidade Federal de Viçosa, Viçosa, 2011. |
Tipo de Acesso: | Acesso Aberto |
URI: | http://locus.ufv.br/handle/123456789/3750 |
Data do documento: | 13-Mai-2011 |
Aparece nas coleções: | Engenharia Civil |
Arquivos associados a este item:
Arquivo | Descrição | Tamanho | Formato | |
---|---|---|---|---|
texto completo.pdf | 4,34 MB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.